Q 11. Each component of the software product is separately estimated and the results aggregated to produce an estimate for the overall job.

(A) Algorithmic model
(B) Expert judgment
(C) Bottom-up
(D) Top down
WhatsApp Facebook Telegram

Share in MCQ Buddy Groups

Share

A

Admin • 27.81K Points
Instructor II

Q 12. In the initial stage of the project the probability of completing the project is ___ .

(A) Zero
(B) High
(C) Low
(D) Any of the above
WhatsApp Facebook Telegram

Share in MCQ Buddy Groups

Share

V

Vijay Sangwan • 19.12K Points
Tutor I

Q 13. The probability of completing the project can be estimated based upon the ____ .

(A) Uniform distribution curve
(B) Normal distribution curve.
(C) U-shaped distribution curve
(D) None of the above
WhatsApp Facebook Telegram

Share in MCQ Buddy Groups

Share

V

Vinay • 19K Points
Tutor I

Q 14. Resorce requirement in project becomes constant while the project is in its _____ progress stage.

(A) 40 to 55%
(B) 55 to 70%
(C) 70 to 80%
(D) 80 to 95%
WhatsApp Facebook Telegram

Share in MCQ Buddy Groups

Share

P

Praveen Singh • 27.20K Points
Instructor II

Q 15. Five dimensions that must be managed on a project

(A) Constraint, Quality, Cost, Schedule, Staff
(B) Features, Quality, Cost, Schedule, Staff
(C) Features, priority, Cost, Schedule, Staff
(D) Features, Quality, Cost, Schedule, customer
WhatsApp Facebook Telegram

Share in MCQ Buddy Groups

Share

S

Shiva Ram • 21.45K Points
Instructor III

Q 16. Project performance consists of

(A) Time
(B) Cost
(C) Quality
(D) All of the above
WhatsApp Facebook Telegram

Share in MCQ Buddy Groups

Share

P

Praveen Singh • 27.20K Points
Instructor II

Q 17. Design phase consist of

(A) Input received
(B) Output received
(C) Both (A) and (B)
(D) None of the above
WhatsApp Facebook Telegram

Share in MCQ Buddy Groups

Share

V

Vijay Sangwan • 19.12K Points
Tutor I

Q 18. Following are the phases of Project Management Life Cycle. Arrange them in correct order Design, 2. Marketing, 3. Analysis and evaluation, 4. Inspection, testing and delivery

(A) 3-2-1-4
(B) 1-2-3-4
(C) 2-3-1-4
(D) 4-3-2-1
WhatsApp Facebook Telegram

Share in MCQ Buddy Groups

Share

P

Praveen Singh • 27.20K Points
Instructor II

Q 19. Following is(are) the responsibility(ies) of the project manager.

(A) Budgeting and cost control
(B) Allocating resources
(C) Tracking project expenditure
(D) All of the above
WhatsApp Facebook Telegram

Share in MCQ Buddy Groups

Share

P

Praveen Singh • 27.20K Points
Instructor II

Q 20. The project life cycle consists of

(A) Understanding the scope of the project
(B) Objectives of the project
(C) Formulation and planning various activities
(D) All of the above