Q. If during operation of a boiler one of the riveted joints is found leaking
  • (A) The boiler is stopped immediately
  • (B) All the riveted joints are reopened and gain riveted
  • (C) Depending upon the zone of boiler in which the joint leaks, decision is taken
  • (D) The joint is repaired if in low pressure zones otherwise boiler sent for repairs
πŸ’¬ Discuss
βœ… Correct Answer: (D) The joint is repaired if in low pressure zones otherwise boiler sent for repairs