Q. in ______ type of crane, heavy temporary staging or platform is prepared for the working of the crane.

  • (A) Cableways
  • (B) Swing jib
  • (C) Goliath
  • (D) Platform
Show Answer Discuss Share

V

Vinay Kumar • 8.55K Points
Tutor III

Q. ______ are cranes of swing jib type and are mounted on high steel towers.

  • (A) Cableways
  • (B) Swing jib
  • (C) Tower
  • (D) Goliath
Show Answer Discuss Share

V

Vinay Kumar • 8.55K Points
Tutor III

Q. the removal of earth for highway formation is ______.

  • (A) Embankment
  • (B) Sub grade
  • (C) Excavation
  • (D) Filling
Show Answer Discuss Share

V

Vinay Kumar • 8.55K Points
Tutor III

Q. the best time to remove soil is during ______.

  • (A) Summer
  • (B) Winter
  • (C) Rainy season
  • (D) During storm
Show Answer Discuss Share

V

Vinay Kumar • 8.55K Points
Tutor III

Q. what is the equipment used for short haul distance of 100 m?

  • (A) Bulldozer
  • (B) Scrapper
  • (C) Power shovel
  • (D) Hoe
Show Answer Discuss Share

V

Vinay Kumar • 8.55K Points
Tutor III

Q. the precise control of excavation is possible by _______.

  • (A) Scrapper
  • (B) Hoe
  • (C) Shovel
  • (D) Bulldozer
Show Answer Discuss Share