πŸ“Š Advance Construction Technology
Q. The pre-stressed concrete piles as compared to pre-cast and reinforced concrete piles
  • (A) are lesser in weight
  • (B) have high load carrying capacity
  • (C) are extremely durable
  • (D) all of these
πŸ’¬ Discuss
βœ… Correct Answer: (D) all of these
πŸ“Š Advance Construction Technology
Q. A screw pile consists of cast iron or steel shaft of external diameter varying from
  • (A) 0 to 150 mm
  • (B) 150 to 300 mm
  • (C) 300 to 450 mm
  • (D) 450 to 600 mm
πŸ’¬ Discuss
βœ… Correct Answer: (B) 150 to 300 mm
πŸ“Š Advance Construction Technology
Q. When the depth of water is from 4.5 to 6 m, the type of cofferdam used is
  • (A) earthen cofferdam
  • (B) rock fill cofferdam
  • (C) single-walled cofferdam
  • (D) double walled cofferdam
πŸ’¬ Discuss
βœ… Correct Answer: (C) single-walled cofferdam
πŸ“Š Advance Construction Technology
Q. A watertight structure constructed in connection with excavations for piers is………
  • (A) caisson
  • (B) cofferdam
  • (C) well foundation
  • (D) raft foundation
πŸ’¬ Discuss
βœ… Correct Answer: (A) caisson
πŸ“Š Advance Construction Technology
Q. Which of the following is type of cofferdam?
  • (A) Rock-filled crib cofferdam
  • (B) Cellular cofferdam
  • (C) Suspended cofferdam
  • (D) All of the above
πŸ’¬ Discuss
βœ… Correct Answer: (D) All of the above
πŸ“Š Advance Construction Technology
Q. Which cofferdam is suitable at place where velocity of flow is slow & depth of water is 1.5m?
  • (A) Rock-fill cofferdam
  • (B) Earth-fill cofferdam
  • (C) Rock-filled crib cofferdam
  • (D) Cellular cofferdam
πŸ’¬ Discuss
βœ… Correct Answer: (B) Earth-fill cofferdam