Q. The process starting with the terminal modules is called

  • (A) top-down integration
  • (B) bottom-up integration
  • (C) none of the above
  • (D) module integration
πŸ’¬ Discuss
βœ… Correct Answer: (B) bottom-up integration

Q. The inputs for developing a test plan are taken from

  • (A) project plan
  • (B) business plan
  • (C) support plan
  • (D) none of the above
πŸ’¬ Discuss
βœ… Correct Answer: (A) project plan

Q. Function/Test matrix is a type of

  • (A) interim test report
  • (B) final test report
  • (C) project status report
  • (D) management report
πŸ’¬ Discuss
βœ… Correct Answer: (C) project status report

Q. Which of the following is not White box testing?

  • (A) structural testing
  • (B) code-based testing
  • (C) glass box testing.
  • (D) closed box testing
πŸ’¬ Discuss
βœ… Correct Answer: (D) closed box testing

Q. Sandwich/hybrid strategy is---

  • (A) top down
  • (B) bottom up
  • (C) combination of top down & bottom up
  • (D) none of the above
πŸ’¬ Discuss
βœ… Correct Answer: (C) combination of top down & bottom up

Q. System Testing is ----

  • (A) black box testing
  • (B) white box testing
  • (C) smoke testing
  • (D) both a) and b)
πŸ’¬ Discuss
βœ… Correct Answer: (A) black box testing

Q. Which is required skill of a Tester?

  • (A) good programmer
  • (B) reliable
  • (C) attention to details
  • (D) being diplomatic
πŸ’¬ Discuss
βœ… Correct Answer: (A) good programmer

Q. What is the main goal of software testing?

  • (A) testing
  • (B) bug prevention
  • (C) study
  • (D) execution
πŸ’¬ Discuss
βœ… Correct Answer: (B) bug prevention

Q. Which of the following is not a level in testing?

  • (A) system testing
  • (B) black box testing.
  • (C) integration testing
  • (D) functional testing
πŸ’¬ Discuss
βœ… Correct Answer: (D) functional testing

Q. Following is not a Software Test Life Cycle Phase.

  • (A) requirements gathering
  • (B) test planning
  • (C) test closure
  • (D) test design
πŸ’¬ Discuss
βœ… Correct Answer: (A) requirements gathering

Jump to