Q. Which of the following approaches are used to achieve reliable systems?
  • (A) Fault prevention
  • (B) Fault removal
  • (C) Fault tolerance
  • (D) All of the mentioned
πŸ’¬ Discuss
βœ… Correct Answer: (D) All of the mentioned
πŸ“Š Software Testing
Q. A system maintaining its integrity while accepting a temporary halt in its operation is said to be in a state of
  • (A) Full Fault Tolerance
  • (B) Graceful Degradation
  • (C) Fail Soft
  • (D) Fail Safe
πŸ’¬ Discuss
βœ… Correct Answer: (D) Fail Safe
πŸ“Š Software Testing
Q. Which of the following Error Detection checks is not a part of Application detection?
  • (A) Hardware checks
  • (B) Timing checks
  • (C) Reversal checks
  • (D) Coding checks
πŸ’¬ Discuss
βœ… Correct Answer: (A) Hardware checks
πŸ“Š Software Testing
Q. Exception handling is a type of
  • (A) Forward error recovery mechanism
  • (B) Backward error recovery mechanism
  • (C) Top recovery mechanism
  • (D) Bottom recovery mechanism
πŸ’¬ Discuss
βœ… Correct Answer: (A) Forward error recovery mechanism
πŸ“Š Software Testing
Q. All fault-tolerant techniques rely on
  • (A) Integrity
  • (B) Dependability
  • (C) Redundancy
  • (D) Inter-dependability
πŸ’¬ Discuss
βœ… Correct Answer: (C) Redundancy
πŸ“Š Software Testing
Q. It is imperative for communicating processes to reach consistent recovery points to avoid the _________ effect, with backward error recovery mechanism.
  • (A) Static
  • (B) Dynamic
  • (C) Domino
  • (D) Whirlpool
πŸ’¬ Discuss
βœ… Correct Answer: (C) Domino
πŸ“Š Software Testing
Q. What do you understand by V&V in software testing?
  • (A) Verified Version
  • (B) Version Validation
  • (C) Verification and Validation
  • (D) Version Verification
πŸ’¬ Discuss
βœ… Correct Answer: (C) Verification and Validation
πŸ“Š Software Testing
Q. When does the testing process stops?
  • (A) When resources (time and budget) are over
  • (B) When some coverage is reached
  • (C) When quality criterion is reached
  • (D) Testing never ends.
πŸ’¬ Discuss
βœ… Correct Answer: (C) When quality criterion is reached
πŸ“Š Software Testing
Q. Quality also can be looked at in terms of user satisfaction which includes
  • (A) A compliant product
  • (B) Good quality output
  • (C) Delivery within budget and schedule
  • (D) All of the mentioned
πŸ’¬ Discuss
βœ… Correct Answer: (D) All of the mentioned
πŸ“Š Software Testing
Q. Inspections and testing are what kinds of Quality Costs
  • (A) Prevention
  • (B) Internal Failure
  • (C) External Failure
  • (D) Appraisal
πŸ’¬ Discuss
βœ… Correct Answer: (D) Appraisal