Q. In on-line scheduling, scheduler make the schedule ……………………... that will be released in future.
  • (A) with the knowledge of the jobs
  • (B) without the knowledge of the jobs
  • (C) both
  • (D) None of these
πŸ’¬ Discuss
βœ… Correct Answer: (B) without the knowledge of the jobs