Q. Where does the granular molding material get loaded into?

  • (A) barrel
  • (B) hopper
  • (C) pellets
  • (D) split
๐Ÿ’ฌ Discuss
โœ… Correct Answer: (B) hopper
Explanation: in a ram or plunger type injection molding system, the granular molding material has to be first loaded into a hopper, after which, with the help of a feeding device it gets metered out inside a cylinder.

Explanation by: Mr. Dubey
in a ram or plunger type injection molding system, the granular molding material has to be first loaded into a hopper, after which, with the help of a feeding device it gets metered out inside a cylinder.

๐Ÿ’ฌ Discussion

๐Ÿ“Š Question Analytics

๐Ÿ‘๏ธ
514
Total Visits
๐Ÿ“ฝ๏ธ
3 y ago
Published
๐ŸŽ–๏ธ
Mr. Dubey
Publisher
๐Ÿ“ˆ
98%
Success Rate