M
No solution found for this question.
Add Solution and get +2 points.
You must be Logged in to update hint/solution
Related MCQs
Q. A construction team includes ?
Q. The failure of foundation of a building is due to
Q. If a door swings towards the person opening it, it is called:
Q. The most popular type of organisation used for Civil Engineering Constructions, is
Q. The final setting time of ordinary cement should not be more than ?
Q. Which of the following is not quality system document for getting the ISO 9000 certificate?
Q. When the flow parameters at any given instant remain same at every point, then flow is said to be
Q. The suitable gradient within which the engineer must endeavour to design the road ?
Discusssion
Login to discuss.