πŸ“Š Software Engineering
Q. In Bottom-up integration
  • (A) The low-level components of a system are integrated and tested before the higher-level components have been developed
  • (B) The testing process starts with modules at lower levels in the hierarchy and works up the hierarchy of modules until the final module is tested.
  • (C) An event driven control system, where an event is broadcasted to each sub- system and any sub-system that can handle that event responds to it.
  • (D) Control starts of the top of a sub routine hierarchy and through sub routine calls passes to lower levels.
πŸ’¬ Discuss
βœ… Correct Answer: (A) The low-level components of a system are integrated and tested before the higher-level components have been developed

You must be Logged in to update hint/solution

πŸ’¬ Discussion

πŸ“Š Question Analytics

πŸ‘οΈ
1063
Total Visits
πŸ“½οΈ
1 y ago
Published
πŸŽ–οΈ
Vikash Gupta
Publisher
πŸ“ˆ
82%
Success Rate