Q. Bottom-up testing

  • (A) The low-level components of a system are integrated and tested before the higher-level components have been developed.
  • (B) The testing process starts with modules at lower levels in the hierarchy and works up the hierarchy of modules until the final module is tested.
  • (C) An event driven control system, where an event is broadcasted to each sub- system and any sub-system that can handle that event responds to it.
  • (D) Control starts of the top of a sub routine hierarchy and through sub routine calls passes to lower levels.
πŸ’¬ Discuss
βœ… Correct Answer: (B) The testing process starts with modules at lower levels in the hierarchy and works up the hierarchy of modules until the final module is tested.

You must be Logged in to update hint/solution

πŸ’¬ Discussion

πŸ“Š Question Analytics

πŸ‘οΈ
670
Total Visits
πŸ“½οΈ
1 y ago
Published
πŸŽ–οΈ
Vijay Sangwan
Publisher
πŸ“ˆ
97%
Success Rate