G
No solution found for this question.
Add Solution and get +2 points.
You must be Logged in to update hint/solution
Related MCQs
Q. Cement used for normal concrete construction, is obtained by burning a mixture of
Q. The value of group index of a soil varies from
Q. Number of rivets required in a joint, is
Q. In time-cost optimization of a project, crashing is done.
Q. When the length of a chain along a slope of ? is (l), the correction for slope required is ?
Discusssion
Login to discuss.