Q. As per IRC recommendations, the sub-grade or sub-base layer whatever underlies the concrete shearing slab, in concrete pavements, must confirm to the requirement that ?

  • (A) the base or sub-base extends atleast 30 cm wider on either side of the width to be concreted
  • (B) no soft spots are present in the sub-grade or sub-base
  • (C) the sub-grade is properly drained
  • (D) all of the above