Q. In performing the works test ?
  • (A) the mould for test specimen should be made of non-absorbent material
  • (B) the mould should be constructed in such a way that there is leakage of water from test specimen during moulding
  • (C) the base plate of the mould should be of non-absorbent material
  • (D) all of the above
πŸ’¬ Discuss
βœ… Correct Answer: (D) all of the above