Q. If to, tp and tm are the optimistic, pessimistic and most likely time estimates of an activity respectively, the expected time t of the activity will be

  • (A) to + 3tm+ tp/3
  • (B) to + 4tm+ tp/4
  • (C) to + 4tm+ tp/5
  • (D) to + 4tm+ tp/6