Home / Engineering / Power Plant Engineering (PPE) MCQs / Page 1
Power Plant Engineering (PPE) MCQs | Page - 1
Dear candidates you will find MCQ questions of Power Plant Engineering (PPE) here. Learn these questions and prepare yourself for coming examinations and interviews. You can check the right answer of any question by clicking on any option or by clicking view answer button.
M
Q. 1) All of the nuclear fuel reserve will be ended in about 400 years.
M
Q. 2) With respect to the load centre which location is suitable for stablishment of nuclear power plant?
M
Q. 3) Operating cost of nuclear power plant is less than thermal power plant.
M
Q. 4) What is the role of breaker house in coal feeding?
M
Q. 5) Large amount of coal is transported by
M
Q. 6) The coal is fed to the furnace through
M
Q. 7) What is the function of cyclone separators in pneumatic ash handling system?
M
Q. 8) Which medium is used to carry ash in the pneumatic ash handling system?
M
Q. 9) Which system is noisy out of all the following ash handling systems?
M
Q. 10) Which medium is used to carry ash in hydraulic system?
Explore Sets
Power Plant Engineering (PPE) MCQs Set 1
Power Plant Engineering (PPE) MCQs Set 2
Power Plant Engineering (PPE) MCQs Set 3
Power Plant Engineering (PPE) MCQs Set 4
Power Plant Engineering (PPE) MCQs Set 5
Power Plant Engineering (PPE) MCQs Set 6
Power Plant Engineering (PPE) MCQs Set 7
Power Plant Engineering (PPE) MCQs Set 8
Power Plant Engineering (PPE) MCQs Set 9
Power Plant Engineering (PPE) MCQs Set 10
Power Plant Engineering (PPE) MCQs Set 11
Power Plant Engineering (PPE) MCQs Set 12
Power Plant Engineering (PPE) MCQs Set 13
Power Plant Engineering (PPE) MCQs Set 14
Power Plant Engineering (PPE) MCQs Set 15
Power Plant Engineering (PPE) MCQs Set 16
Explore More Categories
Click on category to learn MCQs of that category.Electronics and Communication Engineering