Q. The system failure due to power failure is considered under

  • (A) Hardware reliability
  • (B) Software reliability
  • (C) Operation reliability
  • (D) None of these
πŸ’¬ Discuss
βœ… Correct Answer: (A) Hardware reliability

Q. Components such as wheel, chain, handle etc are assembled to produce bicycle. The use of bicycle as transportation device is considered to be

  • (A) Functional property
  • (B) Non-functional property
  • (C) Software system
  • (D) None of these
πŸ’¬ Discuss
βœ… Correct Answer: (A) Functional property

Q. A computer program is a

  • (A) Software
  • (B) Hardware
  • (C) System
  • (D) None of these
πŸ’¬ Discuss
βœ… Correct Answer: (A) Software

Q. Software system consists of

  • (A) Programs
  • (B) Configuration files
  • (C) Documentation
  • (D) All of the above
πŸ’¬ Discuss
βœ… Correct Answer: (D) All of the above

Q. User documentation defines

  • (A) Computer program
  • (B) Computer system
  • (C) Use of computer systems
  • (D) Structure of computer system
πŸ’¬ Discuss
βœ… Correct Answer: (C) Use of computer systems

Q. System documentation defines

  • (A) Computer programs
  • (B) Computer systems
  • (C) Use of computer systems
  • (D) Structure of computer system
πŸ’¬ Discuss
βœ… Correct Answer: (D) Structure of computer system

Q. System engineering is concerned with

  • (A) Hardware development
  • (B) System development
  • (C) Software engineering
  • (D) All of the above
πŸ’¬ Discuss
βœ… Correct Answer: (D) All of the above

Q. Software process involves

  • (A) Software specification and developments
  • (B) Software validation and evolution
  • (C) A and B both
  • (D) None of these
πŸ’¬ Discuss
βœ… Correct Answer: (C) A and B both

Q. Mutable requirements are

  • (A) Requirements that change due to the environment in which the organization is operating
  • (B) Emerges due to user’s understanding of system
  • (C) Dependent on particular system
  • (D) None of these
πŸ’¬ Discuss
βœ… Correct Answer: (A) Requirements that change due to the environment in which the organization is operating

Q. Requirement Engineering process does not involves

  • (A) Feasibility study
  • (B) Requirement elicitation and an analysis
  • (C) Requirement validation and management
  • (D) Data processing
πŸ’¬ Discuss
βœ… Correct Answer: (D) Data processing

Jump to