Q. When the deviations between the actual performance and the planned performance are within the limits
  • (A) A limited corrective action is required
  • (B) No corrective action is required
  • (C) A major corrective action is required
  • (D) None of the above
๐Ÿ’ฌ Discuss
โœ… Correct Answer: (B) No corrective action is required