R
No solution found for this question.
Add Solution and get +2 points.
You must be Logged in to update hint/solution
Related MCQs
Q. Green building practices include
Q. When float or slack of an activity is positive ?
Q. Direct measurement of permeability of the specimen at any stage of loading can be made
Q. 1 NEED FOR DIMENSIONAL ANALYSIS - METHODS OF DIMENSIONAL ANALYSIS
Q. The longitudinal levels, in detailed survey of a hill road, should be taken at
Q. The minimum thickness of the base of a flexible pavement is kept as ?
Discusssion
Login to discuss.