Q. A CPM family includes (A) CPA (Critical Path Analysis) (B) CPP (Critical Path Plotted) (C) MCE (Minimum Cost Expenditure) (D) All the above ποΈ Show Answer π¬ Discuss π Share β‘Menu β Correct Answer: (D) All the above