Q. Segregation is responsible for
  • (A) honey-combed concrete
  • (B) porous layers in concrete
  • (C) surface scaling in concrete
  • (D) all the above
πŸ’¬ Discuss
βœ… Correct Answer: (D) all the above
πŸ“Š Concrete Technology and Design
Q. If the effective working time is 7 hours and per batch time of concrete is 3 minutes, the output of a concrete mixer of 150 litre capacity, is
  • (A) 15,900 litres
  • (B) 16,900 litres
  • (C) 17,900 litres
  • (D) 18,900 litres
πŸ’¬ Discuss
βœ… Correct Answer: (D) 18,900 litres
πŸ“Š Concrete Technology and Design
Q. An ordinary Portland cement when tested for its fineness, should not leave any residue on I.S. sieve No. 9, more than
  • (A) 5 %
  • (B) 10 %
  • (C) 15 %
  • (D) 20 %
πŸ’¬ Discuss
βœ… Correct Answer: (B) 10 %
πŸ“Š Concrete Technology and Design
Q. The top diameter, bottom diameter and the height of a slump mould are:
  • (A) 10 cm, 20 cm, 30 cm
  • (B) 10 cm, 30 cm, 20 cm
  • (C) 20 cm, 10 cm, 30 cm
  • (D) 20 cm, 30 cm, 10 cm
πŸ’¬ Discuss
βœ… Correct Answer: (A) 10 cm, 20 cm, 30 cm