πŸ“Š Construction Management
Q. Completion of an activity on CPM network diagram, is generally known
  • (A) Event
  • (B) Node
  • (C) Connector
  • (D) All the above
πŸ’¬ Discuss
βœ… Correct Answer: (D) All the above
πŸ“Š Construction Management
Q. Assertion A: For a given depth of cut, the output of a power shovel can be increased by decreasing the angle of swing. Reason R: If the angle of swing is decreased, the cycle time will be decreased. Select the correct answer.
  • (A) Both A and R is true and R is the correct explanation of A
  • (B) Both A and R is true but R is not the correct explanation ofA
  • (C) A is true but R is false
  • (D) A is false but R is true
πŸ’¬ Discuss
βœ… Correct Answer: (A) Both A and R is true and R is the correct explanation of A
πŸ“Š Construction Management
Q. The salient feature of functional organisation is
  • (A) Strict adherence to specifications
  • (B) Separation of planning and design part
  • (C) Each individual maintains functional efficiency
  • (D) All the above
πŸ’¬ Discuss
βœ… Correct Answer: (D) All the above
πŸ“Š Construction Management
Q. A tractor shovel has a purchase price of Rs. 4.7 lacs and could save the organization an amount of rupees one lac per year on operating costs. The salvage value after the amortization period is 10% of the purchase price. The capital recovery period will be
  • (A) 3.7 years
  • (B) 4.23 years
  • (C) 5 years
  • (D) 7.87 years
πŸ’¬ Discuss
βœ… Correct Answer: (B) 4.23 years
πŸ“Š Construction Management
Q. The first method invented for planning projects, was
  • (A) Bar chart method
  • (B) Milestone chart
  • (C) Critical path method (CPM)
  • (D) Programme Evaluation and Review Technique (PERT)
πŸ’¬ Discuss
βœ… Correct Answer: (A) Bar chart method
πŸ“Š Construction Management
Q. Which one of the following is not an excavating and moving type of equipment?
  • (A) Bulldozer
  • (B) Clam shell
  • (C) Scraper
  • (D) Dump truck
πŸ’¬ Discuss
βœ… Correct Answer: (D) Dump truck
πŸ“Š Construction Management
Q. The main disadvantage of line organisation, is
  • (A) Rigid structure
  • (B) Extraordinary delay in communications
  • (C) Top level executions over work
  • (D) All the above
πŸ’¬ Discuss
βœ… Correct Answer: (D) All the above
πŸ“Š Construction Management
Q. Batching refers to
  • (A) Controlling the total quantity at each batch
  • (B) Weighing accurately, the quantity of each material for a job beforemixing
  • (C) Controlling the quantity of each material into each batch
  • (D) Adjusting the water to be added in each batch according to the moisture content ofthe materials being mixed in the batch
πŸ’¬ Discuss
βœ… Correct Answer: (C) Controlling the quantity of each material into each batch
πŸ“Š Construction Management
Q. While scheduling a project by C.P.M.
  • (A) A project is divided into various activities
  • (B) Required time for each activity is established
  • (C) Net work is drawn by connecting the activities and the events
  • (D) All the above
πŸ’¬ Discuss
βœ… Correct Answer: (D) All the above