Q. The estimated time required to perform an activity, is known as
β
Correct Answer: (C)
Duration
Q. Critical Path Net Work helps an engineer
β
Correct Answer: (D)
All the above
Q. B. If he decides to invest in A, for every rupee invested, he is assured of doubling his money in ten years. If he decides to invest in B, he is assured of making his money 1.5 times in 5 years. If the contractor values his money at 10% interest rate, he
β
Correct Answer: (A)
Should invest in neither of the two projects
Q. Henry Gantt developed Bar charts for planning and scheduling of projects in
β
Correct Answer: (B)
1900
Q. If TL is the latest allowable event occurrence time, total activity slack(s), is equal to
β
Correct Answer: (D)
All the above
Q. Modular co-ordination of construction means proper
β
Correct Answer: (D)
All the above
Q. The final selection of a construction site, is done by
β
Correct Answer: (D)
All the above
Q. The main advantage of line organisation is:
β
Correct Answer: (D)
All the above