Q. Break-even analysis can be used for
  • (A) short run analysis
  • (B) long run analysis
  • (C) average of above two run analysis
  • (D) there is no such criterion
πŸ’¬ Discuss
βœ… Correct Answer: (A) short run analysis
πŸ“Š Industrial Engineering
Q. Break-even analysis consists of
  • (A) fixed cost
  • (B) variable cost
  • (C) fixed and variable costs
  • (D) operation costs
πŸ’¬ Discuss
βœ… Correct Answer: (C) fixed and variable costs
πŸ“Š Industrial Engineering
Q. Break-even analysis shows profit when
  • (A) sales revenue > total cost
  • (B) sales revenue = total cost
  • (C) sales revenue < total cost
  • (D) variable cost < fixed cost
πŸ’¬ Discuss
βœ… Correct Answer: (A) sales revenue > total cost
πŸ“Š Industrial Engineering
Q. Choose the wrong statement Time study is used to
  • (A) determine overhead expenses
  • (B) provide a basis for setting piece prices or incentive wages
  • (C) determine standard costs
  • (D) determine the capability of an operator to handle the number of machines
πŸ’¬ Discuss
βœ… Correct Answer: (A) determine overhead expenses
πŸ“Š Industrial Engineering
Q. Choose the wrong statement. Motion study is used for
  • (A) improving a work method
  • (B) improvising a work method
  • (C) designing a work method
  • (D) reducing inventory costs
πŸ’¬ Discuss
βœ… Correct Answer: (D) reducing inventory costs
πŸ“Š Industrial Engineering
Q. CPM has following time estimate
  • (A) one time estimate
  • (B) two time estimate
  • (C) three time estimate
  • (D) four time estimate
πŸ’¬ Discuss
βœ… Correct Answer: (A) one time estimate
πŸ“Š Industrial Engineering
Q. CPM is the
  • (A) time oriented technique
  • (B) event oriented technique
  • (C) activity oriented technique
  • (D) target oriented technique
πŸ’¬ Discuss
βœ… Correct Answer: (C) activity oriented technique