Q. Work study is concerned with
  • (A) improving present method and finding standard time
  • (B) motivation of workers
  • (C) improving production capability
  • (D) improving production planning and control
πŸ’¬ Discuss
βœ… Correct Answer: (A) improving present method and finding standard time
πŸ“Š Industrial Engineering
Q. 'Value' for value engineering and analysis purposes is defined as
  • (A) purchase value
  • (B) saleable value
  • (C) depreciated value
  • (D) function/cost.
πŸ’¬ Discuss
βœ… Correct Answer: (D) function/cost.
πŸ“Š Industrial Engineering
Q. A big advantage of PERT over Gantt charts is that in the former case
  • (A) activities and events are clearly shown
  • (B) early start and late finish of an acΒ¬tivity are clearly marked
  • (C) activity times are clear
  • (D) inter-relationship among activities is clearly shown.
πŸ’¬ Discuss
βœ… Correct Answer: (D) inter-relationship among activities is clearly shown.
πŸ“Š Industrial Engineering
Q. A graphical device used to determine the break-even point and profit potential under varying conditions of output and costs, is known as
  • (A) Gnatt chart
  • (B) flow chart
  • (C) break-even chart
  • (D) PERT chart
πŸ’¬ Discuss
βœ… Correct Answer: (C) break-even chart
πŸ“Š Industrial Engineering
Q. A low unit cost can be obtained by following
  • (A) product layout
  • (B) functional layout
  • (C) automatic material handling equipment
  • (D) specialization of operation
πŸ’¬ Discuss
βœ… Correct Answer: (A) product layout
πŸ“Š Industrial Engineering
Q. ABC analysis deals with
  • (A) analysis of process chart
  • (B) flow of material
  • (C) ordering schedule of job
  • (D) controlling inventory costs money
πŸ’¬ Discuss
βœ… Correct Answer: (D) controlling inventory costs money
πŸ“Š Industrial Engineering
Q. Acceptance sampling is widely used in
  • (A) batch production
  • (B) job production
  • (C) mass production
  • (D) all of the above
πŸ’¬ Discuss
βœ… Correct Answer: (C) mass production
πŸ“Š Industrial Engineering
Q. According to MAPI formula, the old machine should be replaced by new one when
  • (A) CAM < DAM
  • (B) CAM > DAM
  • (C) CAM = DAM
  • (D) there is no such criterion
πŸ’¬ Discuss
βœ… Correct Answer: (A) CAM < DAM
πŸ“Š Industrial Engineering
Q. According to Rowan plan, if H = hourly rate, A = actual time and S = standard time, then wages will be
  • (A) HA
  • (B) HA + (S~A) HA
  • (C) HA + ^Λ†-H
  • (D) HA + ^Λ†-H
πŸ’¬ Discuss
βœ… Correct Answer: (B) HA + (S~A) HA
πŸ“Š Industrial Engineering
Q. An optimum project schedule implies
  • (A) optimum utilisation of men, machines and materials
  • (B) lowest possible cost and shortest possible time for project
  • (C) timely execution of project
  • (D) to produce best results under given constraints
πŸ’¬ Discuss
βœ… Correct Answer: (B) lowest possible cost and shortest possible time for project