πŸ“Š CAD-CAM and Automation
Q. n an NC machining operation, the tool has to be moved from point (5, 4) to point (7, 2) along a circular path with centre at (5, 2). Before starting the operation, the tool is at (5, 4). The G and N codes for this motion are
  • (A) N010 GO3 X7.0 Y2.0 I5.0 J2.0
  • (B) N010 GO2 X7.0 Y2.0 I5.0 J2.0
  • (C) N010 GO1 X7.0 Y2.0 I5.0 J2.0
  • (D) N010 GOO X7.0 Y2.0 I5.0 J2.0
πŸ’¬ Discuss
βœ… Correct Answer: (B) N010 GO2 X7.0 Y2.0 I5.0 J2.0

You must be Logged in to update hint/solution

πŸ’¬ Discussion

πŸ“Š Question Analytics

πŸ‘οΈ
348
Total Visits
πŸ“½οΈ
1 y ago
Published
πŸŽ–οΈ
Vikash Gupta
Publisher
πŸ“ˆ
88%
Success Rate