Q. The decision in a sequential sampling scheme is taken ______.
  • (A) after inspecting the sample as a whole.
  • (B) after selection and inspection of items one by one.
  • (C) before inspecting the sample as a whole.
  • (D) before selection and inspection of items one by one
πŸ’¬ Discuss
βœ… Correct Answer: (B) after selection and inspection of items one by one.