Q. The method of costing applied in lathe is ………………….
  • (A) Process costing
  • (B) marginal costing
  • (C) Absorption costing
  • (D) job costing
πŸ’¬ Discuss
βœ… Correct Answer: (D) job costing
πŸ“Š Applied Cost Accounting
Q. Job costing is ………………………….
  • (A) Method of costing
  • (B) technique of costing
  • (C) Cost ascertainment
  • (D) cost estimation
πŸ’¬ Discuss
βœ… Correct Answer: (A) Method of costing
πŸ“Š Applied Cost Accounting
Q. The method of batch costing is used in …………………
  • (A) Manufacture of agriculture product
  • (B) construction of building
  • (C) Manufacturing medicines
  • (D) processing of oil
πŸ’¬ Discuss
βœ… Correct Answer: (C) Manufacturing medicines
πŸ“Š Applied Cost Accounting
Q. The method of job costing is applied
  • (A) Biscuit manufacturing
  • (B) oil refining
  • (C) Medicine manufacturing
  • (D) Engineering work shop
πŸ’¬ Discuss
βœ… Correct Answer: (D) Engineering work shop
πŸ“Š Applied Cost Accounting
Q. The number of units to be manufactured in one batch
  • (A) Economic order Quantity
  • (B) Economic Quantity
  • (C) Economic batch Quantity
  • (D) ordering unit
πŸ’¬ Discuss
βœ… Correct Answer: (C) Economic batch Quantity
πŸ“Š Applied Cost Accounting
Q. The method of costing applied when articles are manufactured in definite batches is ………………………….
  • (A) Job costing
  • (B) operation costing
  • (C) Batch costing
  • (D) service costing
πŸ’¬ Discuss
βœ… Correct Answer: (C) Batch costing
πŸ“Š Applied Cost Accounting
Q. A method of costing applied where costs are collected and accumulated for each work order is ………………….
  • (A) Process a/c
  • (B) contract costing
  • (C) Operating costing
  • (D) job costing
πŸ’¬ Discuss
βœ… Correct Answer: (D) job costing
πŸ“Š Applied Cost Accounting
Q. A portion of the contact entrusted to somebody else is known as ……………..
  • (A) Extra work
  • (B) Sub contract
  • (C) Cost plus contract
  • (D) fixed price contract
πŸ’¬ Discuss
βœ… Correct Answer: (B) Sub contract
πŸ“Š Applied Cost Accounting
Q. A contract in which the price is fixed in advance is a ………….. contract
  • (A) Sub contract
  • (B) fixed price contract
  • (C) Cost plus contract
  • (D) Fixed cost with Escalation clause
πŸ’¬ Discuss
βœ… Correct Answer: (B) fixed price contract
πŸ“Š Applied Cost Accounting
Q. Estimated profit on incomplete contract can also be called as ,……………..
  • (A) Net profit
  • (B) notional profit
  • (C) Work in progress
  • (D) net loss
πŸ’¬ Discuss
βœ… Correct Answer: (B) notional profit