Q. Find the two levels of development suggested by Booch ?
  • (A) micro and macro processes.
  • (B) inter and intra processes.
  • (C) internal and external processes.
  • (D) small and large processes.
πŸ’¬ Discuss
βœ… Correct Answer: (A) micro and macro processes.
πŸ“Š Business Policy and Project Management
Q. . SSADM means ___________.
  • (A) straight systems analysis design method.
  • (B) structured systems analysis design method.
  • (C) software systems analysis design method.
  • (D) solutions systems analysis design method.
πŸ’¬ Discuss
βœ… Correct Answer: (B) structured systems analysis design method.
πŸ“Š Business Policy and Project Management
Q. . The scope of the deliverables for an increment is rigidly constrained by an agreed deadline called as ____________.
  • (A) sand boxing.
  • (B) time boxing.
  • (C) time delaying.
  • (D) local delaying.
πŸ’¬ Discuss
βœ… Correct Answer: (B) time boxing.
πŸ“Š Business Policy and Project Management
Q. . In software prototype, partial working model is classified into ________.
  • (A) vertical and horizontal.
  • (B) vertical and straight.
  • (C) bended and horizontal.
  • (D) elevated and horizontal.
πŸ’¬ Discuss
βœ… Correct Answer: (A) vertical and horizontal.
πŸ“Š Business Policy and Project Management
Q. In Software Prototype, ___________ means copies of input screens are shown to the users on a workstation, but the screens cannot actually be used.
  • (A) simulation.
  • (B) annealing.
  • (C) mock-ups.
  • (D) rad system.
πŸ’¬ Discuss
βœ… Correct Answer: (C) mock-ups.
πŸ“Š Business Policy and Project Management
Q. ____ is carried out to calculate the earliest dates on which each activity may be started and completed.
  • (A) backward pass.
  • (B) forward pass.
  • (C) no pass.
  • (D) increasing pass.
πŸ’¬ Discuss
βœ… Correct Answer: (B) forward pass.
πŸ“Š Business Policy and Project Management
Q. The activities have zero duration but are assumed to start at the same
time as the first and the end at the same time as the last one is
called__________ activity.
  • (A) hijacked.
  • (B) heuristic.
  • (C) hammocked.
  • (D) hole.
πŸ’¬ Discuss
βœ… Correct Answer: (C) hammocked.
πŸ“Š Business Policy and Project Management
Q. ____________is part of Risk Management.
  • (A) risk analysis and risk estimation.
  • (B) risk control and risk planning.
  • (C) risk identification and monitoring.
  • (D) risk control, planning, identification and monitoring.
πŸ’¬ Discuss
βœ… Correct Answer: (D) risk control, planning, identification and monitoring.