P Praveen Singh π Tutor III β 36.81K Points π Business Policy and Project Management Q. Find the two levels of development suggested by Booch ? (A) micro and macro processes. (B) inter and intra processes. (C) internal and external processes. (D) small and large processes. ποΈ Show Answer π¬ Discuss π Share β‘Menu β Correct Answer: (A) micro and macro processes.
R Ranjeet π Tutor III β 34.60K Points π Business Policy and Project Management Q. Sometimes redesigns of the code is often called as ________. (A) refactoring. (B) redesigning. (C) recoding. (D) rearranging. ποΈ Show Answer π¬ Discuss π Share β‘Menu β Correct Answer: (A) refactoring.
R Ranjeet π Tutor III β 34.60K Points π Business Policy and Project Management Q. . SSADM means ___________. (A) straight systems analysis design method. (B) structured systems analysis design method. (C) software systems analysis design method. (D) solutions systems analysis design method. ποΈ Show Answer π¬ Discuss π Share β‘Menu β Correct Answer: (B) structured systems analysis design method.
R Ranjeet π Tutor III β 34.60K Points π Business Policy and Project Management Q. . The scope of the deliverables for an increment is rigidly constrained by an agreed deadline called as ____________. (A) sand boxing. (B) time boxing. (C) time delaying. (D) local delaying. ποΈ Show Answer π¬ Discuss π Share β‘Menu β Correct Answer: (B) time boxing.
V Vijay Sangwan π Mover β 28.62K Points π Business Policy and Project Management Q. . In software prototype, partial working model is classified into ________. (A) vertical and horizontal. (B) vertical and straight. (C) bended and horizontal. (D) elevated and horizontal. ποΈ Show Answer π¬ Discuss π Share β‘Menu β Correct Answer: (A) vertical and horizontal.
V Vijay Sangwan π Mover β 28.62K Points π Business Policy and Project Management Q. In Software Prototype, ___________ means copies of input screens are shown to the users on a workstation, but the screens cannot actually be used. (A) simulation. (B) annealing. (C) mock-ups. (D) rad system. ποΈ Show Answer π¬ Discuss π Share β‘Menu β Correct Answer: (C) mock-ups.
R Rakesh Kumar π Hard Worker β 28.44K Points π Business Policy and Project Management Q. ____ is carried out to calculate the earliest dates on which each activity may be started and completed. (A) backward pass. (B) forward pass. (C) no pass. (D) increasing pass. ποΈ Show Answer π¬ Discuss π Share β‘Menu β Correct Answer: (B) forward pass.
P Praveen Singh π Tutor III β 36.81K Points π Business Policy and Project Management Q. The activities have zero duration but are assumed to start at the same time as the first and the end at the same time as the last one is called__________ activity. (A) hijacked. (B) heuristic. (C) hammocked. (D) hole. ποΈ Show Answer π¬ Discuss π Share β‘Menu β Correct Answer: (C) hammocked.
S Shiva Ram π Master β 30.44K Points π Business Policy and Project Management Q. ____________is part of Risk Management. (A) risk analysis and risk estimation. (B) risk control and risk planning. (C) risk identification and monitoring. (D) risk control, planning, identification and monitoring. ποΈ Show Answer π¬ Discuss π Share β‘Menu β Correct Answer: (D) risk control, planning, identification and monitoring.
V Vijay Sangwan π Mover β 28.62K Points π Business Policy and Project Management Q. _________ activities on the network diagram have zero duration and use no resources. (A) dangling. (B) dummy. (C) null. (D) zero. ποΈ Show Answer π¬ Discuss π Share β‘Menu β Correct Answer: (B) dummy.