Q 1. The sub-characteristics of efficiency is …..

(A) understandability.
(B) learnability.
(C) resource utilization.
(D) accuracy.

G

Gopal Sharma • 38.32K Points
Coach

Q 2. Diagrammatic form for Flow oriented Modelling………

(A) functional diagrams.
(B) er diagrams.
(C) data flow diagrams.
(D) system flow diagrams.

P

Praveen Singh • 36.81K Points
Coach

Q 3. _________ indicates the connectedness of the system that can be derived mechanically.

(A) dependency.
(B) re-occurrence.
(C) inheritance
(D) relationship.

P

Priyanka Tomar • 35.28K Points
Coach

Q 4. ________ a set of attributes (data items) and that will be manipulated within the software (system).

(A) instance.
(B) class.
(C) object.
(D) data.

V

Vikash Gupta • 33.56K Points
Instructor I

Q 5. Time behaviour is the sub-characteristics of _______.

(A) maintainability.
(B) efficiency.
(C) usability.
(D) reliability.

V

Vikash Gupta • 33.56K Points
Instructor I

Q 6. Security (backups, firewall) will be a ________ requirement.

(A) functional.
(B) non-functional.
(C) normal.
(D) security.

R

Ram Sharma • 193.86K Points
Coach

Q 7. One can_______ is classified into Functional and Non-functional.

(A) project.
(B) requirements.
(C) start date. .
(D) risk

V

Vijay Sangwan • 28.62K Points
Instructor II

Q 8. he Cost Benefit Analysis is done for ___________ feasibility.

(A) social
(B) technical.
(C) programm
(D) economical.

V

Vinay • 28.75K Points
Instructor II

Q 9. CPM can be expanded as _______.

(A) control path method.
(B) critical path method.
(C) cohesion path method.
(D) control path model.

G

Gopal Sharma • 38.32K Points
Coach

Q 10. ________ is refined by Barry Boehm and his co-workers.

(A) cocomo iii.
(B) cocomo iv.
(C) cocomo ii.
(D) cocomo i.