Software Quality Management (SQM) MCQs and Notes

M

Mr. Dubey • 52.30K Points
Coach

Q 1. Defects are less costly if detected in which of the following phases

(A) Coding
(B) Design
(C) Requirements Gathering
(D) Implementation

M

Mr. Dubey • 52.30K Points
Coach

Q 2. Which Software Development Life cycle model will require to start Testing Activities when starting development activities itself

(A) Waterfalls model
(B) Spiral Model
(C) V-model
(D) Linear model

M

Mr. Dubey • 52.30K Points
Coach

Q 3. The name of the testing which is done to make sure the existing features are not affected by new changes

(A) Recursive testing
(B) White box testing
(C) Unit testing
(D) Regression testing

M

Mr. Dubey • 52.30K Points
Coach

Q 4. Unit testing will be done by

(A) Testers
(B) End Users
(C) Customer
(D) Developers

M

Mr. Dubey • 52.30K Points
Coach

Q 5. Which of the following is not used in measuring the size of the software?

(A) KLOC
(B) Function Points
(C) Size of module
(D) Line of Count

M

Mr. Dubey • 52.30K Points
Coach

Q 6. Which of the following is black box testing?

(A) Basic path testing
(B) Boundary value analysis
(C) Code path analysis
(D) None of the mentioned

M

Mr. Dubey • 52.30K Points
Coach

Q 7. Beta testing is done at

(A) User end’s
(B) Developer’s end
(C) Programmer’s end
(D) Developer’s end

M

Mr. Dubey • 52.30K Points
Coach

Q 8. Verification is

(A) Process based
(B) Product based
(C) Cost based
(D) Analysis based

M

Mr. Dubey • 52.30K Points
Coach

Q 9. Variance from product specifications is called?

(A) Report
(B) Requirement
(C) Defect
(D) Analysis

M

Mr. Dubey • 52.30K Points
Coach

Q 10. Informing to the developer which bug to be fix first is called as

(A) Severity
(B) Priority
(C) Fix ability
(D) Traceability

Download our easy to use, user friendly Android App from Play Store. And learn MCQs with one click.

Image