πŸ“Š Software Quality Management (SQM)
Q. To check whether we are developing the right product according to the customer requirements are not. It is a static process
  • (A) Validation
  • (B) Verification
  • (C) Quality Assurance
  • (D) Quality Control
πŸ’¬ Discuss
βœ… Correct Answer: (B) Verification
πŸ“Š Software Quality Management (SQM)
Q. Control Charts is a statistical technique to assess, monitor, and ______the stability of a process.
  • (A) Maintain
  • (B) Process
  • (C) Demand
  • (D) Increase
πŸ’¬ Discuss
βœ… Correct Answer: (A) Maintain
πŸ“Š Software Quality Management (SQM)
Q. Executing the same test case by giving the number of inputs on same build called as
  • (A) Regression Testing
  • (B) Retesting
  • (C) Ad hoc Testing
  • (D) Sanity Testing
πŸ’¬ Discuss
βœ… Correct Answer: (B) Retesting
πŸ“Š Software Quality Management (SQM)
Q. The approach/document used to make sure all the requirements are covered when writing test cases
  • (A) Test Matrix
  • (B) Checklist
  • (C) Test bed
  • (D) Traceability Matrix
πŸ’¬ Discuss
βœ… Correct Answer: (D) Traceability Matrix
πŸ“Š Software Quality Management (SQM)
Q. Reporting Discrepancies as incidents is a part of which phase:
  • (A) Test Analysis and Design
  • (B) Test Implementation and execution
  • (C) Test Closure Activities
  • (D) Evaluating exit criteria and reporting
πŸ’¬ Discuss
βœ… Correct Answer: (B) Test Implementation and execution
πŸ“Š Software Quality Management (SQM)
Q. What is the verification process in software development?
  • (A) The probability that undesirable things will happen such as loss of human life or large financial losses.
  • (B) The process of monitoring the software to ensure full compliance with established standards and procedures
  • (C) The process of trying to discover every conceivable fault or weakness in a work product.
  • (D) The process of evaluating a system or component to determine whether or not the products of a given development phase satisfy the conditions imposed at the start of that phase.
πŸ’¬ Discuss
βœ… Correct Answer: (D) The process of evaluating a system or component to determine whether or not the products of a given development phase satisfy the conditions imposed at the start of that phase.