M Mr. Dubey π Coach β 111.42K Points π Software Quality Management (SQM) Q. Error guessing is a (A) Test verification techniques (B) Test execution techniques (C) Test control management techniques (D) Test data management technique ποΈ Show Answer π¬ Discuss π Share β‘Menu β Correct Answer: (D) Test data management technique
M Mr. Dubey π Coach β 111.42K Points π Software Quality Management (SQM) Q. User Acceptance testing is (A) White box testing (B) Black box testing (C) Gray box testing (D) None of the above ποΈ Show Answer π¬ Discuss π Share β‘Menu β Correct Answer: (B) Black box testing
M Mr. Dubey π Coach β 111.42K Points π Software Quality Management (SQM) Q. Which of the following term is best defined by the statement “The creation of a new code line from a version in an existing code line”? (A) Branching (B) Merging (C) Code line (D) Mainline ποΈ Show Answer π¬ Discuss π Share β‘Menu β Correct Answer: (A) Branching
M Mr. Dubey π Coach β 111.42K Points π Software Quality Management (SQM) Q. A sequence of baselines representing different versions of a system is known as (A) System building (B) Mainline (C) Software Configuration Item(SCI) (D) None of the above ποΈ Show Answer π¬ Discuss π Share β‘Menu β Correct Answer: (A) System building
M Mr. Dubey π Coach β 111.42K Points π Software Quality Management (SQM) Q. Which of the following is a part of system release? (A) Electronic and paper documentation describing the system (B) Packaging and associated publicity that have been designed for that release (C) An installation program that is used to help install the system on target hardware (D) All of the mentioned ποΈ Show Answer π¬ Discuss π Share β‘Menu β Correct Answer: (D) All of the mentioned
M Mr. Dubey π Coach β 111.42K Points π Software Quality Management (SQM) Q. Which of the following is a configuration item? (A) Design specification (B) Source code (C) Test specification (D) All of the mentioned ποΈ Show Answer π¬ Discuss π Share β‘Menu β Correct Answer: (D) All of the mentioned
M Mr. Dubey π Coach β 111.42K Points π Software Quality Management (SQM) Q. Which of the following is a collection of component versions that make up a system? (A) Version (B) Code line (C) Baseline (D) None of the above ποΈ Show Answer π¬ Discuss π Share β‘Menu β Correct Answer: (C) Baseline
M Mr. Dubey π Coach β 111.42K Points π Software Quality Management (SQM) Q. Which of the following is not a build system feature? (A) Minimal recompilation (B) Documentation generation (C) Storage management (D) Reporting ποΈ Show Answer π¬ Discuss π Share β‘Menu β Correct Answer: (C) Storage management
M Mr. Dubey π Coach β 111.42K Points π Software Quality Management (SQM) Q. Which method recommends that very frequent system builds should be carried out with automated testing to discover software problems? (A) Agile method (B) Parallel compilation method (C) Large systems method (D) All of the mentioned ποΈ Show Answer π¬ Discuss π Share β‘Menu β Correct Answer: (A) Agile method
M Mr. Dubey π Coach β 111.42K Points π Software Quality Management (SQM) Q. Which of the following is not a Version management feature? (A) Version and release identification (B) Build script generation (C) Project support (D) Change history recording ποΈ Show Answer π¬ Discuss π Share β‘Menu β Correct Answer: (B) Build script generation