πŸ“Š Software Project Management (SPM)
Q. Which of the following is a example of Configuration Items ?
  • (A) scm procedures
  • (B) source code
  • (C) software design descriptions
  • (D) all of the mentioned
πŸ’¬ Discuss
βœ… Correct Answer: (D) all of the mentioned

Explanation: all are covered in cm.

πŸ“Š Software Project Management (SPM)
Q. CCB stands for
  • (A) change control board
  • (B) change control baseline
  • (C) cumulative changes in baseline
  • (D) none of the mentioned
πŸ’¬ Discuss
βœ… Correct Answer: (A) change control board

Explanation: none.

πŸ“Š Software Project Management (SPM)
Q. What information is required to process a change to a baseline?
  • (A) reasons for making the changes
  • (B) a description of the proposed changes
  • (C) list of other items affected by the changes
  • (D) all of the mentioned
πŸ’¬ Discuss
βœ… Correct Answer: (D) all of the mentioned

Explanation: a baseline is an agreed-to description of the product, changes require multiple reasons..

πŸ“Š Software Project Management (SPM)
Q. Which of the following is an important factor that can affect the accuracy and efficacy of estimates?
  • (A) project size
  • (B) planning process
  • (C) project complexity
  • (D) degree of structural uncertainty
πŸ’¬ Discuss
βœ… Correct Answer: (A) project size

Explanation: as size increases, the interdependence among various elements of the software grows rapidly.

πŸ“Š Software Project Management (SPM)
Q. What describes the data and control to be processed?
  • (A) planning process
  • (B) software scope
  • (C) external hardware
  • (D) project complexity
πŸ’¬ Discuss
βœ… Correct Answer: (B) software scope

Explanation: functions described in the statement of scope are evaluated and in some cases refined to provide more detail prior to the beginning of estimation.

πŸ“Š Software Project Management (SPM)
Q. A number of independent investigators have developed a team-oriented approach to requirements gathering that can be applied to establish the scope of a project called
  • (A) jad
  • (B) class
  • (C) fast
  • (D) none of the mentioned
πŸ’¬ Discuss
βœ… Correct Answer: (C) fast

Explanation: facilitated application specification techniques

πŸ“Š Software Project Management (SPM)
Q. CLSS stands for
  • (A) conveyor line sorting system
  • (B) conveyor line sorting software
  • (C) conveyor line sorting speed
  • (D) conveyor line sorting specification
πŸ’¬ Discuss
βœ… Correct Answer: (A) conveyor line sorting system

Explanation: the conveyor line sorting system (clss) sorts boxes moving along a conveyor line. each box is identified by a barcode that contains a part number and is sorted into one of six bins at the end of the line.

πŸ“Š Software Project Management (SPM)
Q. The project planner examines the statement of scope and extracts all important software functions which is known as
  • (A) association
  • (B) decomposition
  • (C) planning process
  • (D) all of the mentioned
πŸ’¬ Discuss
βœ… Correct Answer: (B) decomposition

Explanation: none

πŸ“Š Software Project Management (SPM)
Q. The environment that supports the software project is called
  • (A) clss
  • (B) see
  • (C) fast
  • (D) cbse
πŸ’¬ Discuss
βœ… Correct Answer: (B) see

Explanation: software engineering environment (see), incorporates hardware and software.

Jump to