πŸ“Š Software Project Management (SPM)
Q. Which of the following is not project management goal?
  • (A) keeping overall costs within budget
  • (B) delivering the software to the customer at the agreed time
  • (C) maintaining a happy and well-functioning development team
  • (D) avoiding customer complaints
πŸ’¬ Discuss
βœ… Correct Answer: (D) avoiding customer complaints

Explanation: projects need to be managed because professional software engineering is always subject to organizational budget and schedule constraints.

πŸ“Š Software Project Management (SPM)
Q. Project managers have to assess the risks that may affect a project.
  • (A) true
  • (B) false
  • (C) ---
  • (D) ---
πŸ’¬ Discuss
βœ… Correct Answer: (B) false

Explanation: risk management involves anticipating risks that might affect the project schedule or the quality of the software being developed, and then taking action to avoid these risks.

πŸ“Š Software Project Management (SPM)
Q. Which of the following is not considered as a risk in project management?
  • (A) specification delays
  • (B) product competition
  • (C) testing
  • (D) staff turnover
πŸ’¬ Discuss
βœ… Correct Answer: (C) testing

Explanation: testing is a part of project, thus it can’t be categorized as risk.

πŸ“Š Software Project Management (SPM)
Q. The process each manager follows during the life of a project is known as
  • (A) project management
  • (B) manager life cycle
  • (C) project management life cycle
  • (D) all of the mentioned
πŸ’¬ Discuss
βœ… Correct Answer: (C) project management life cycle

Explanation: a proven methodical life cycle is necessary to repeatedly implement and manage projects successfully.

πŸ“Š Software Project Management (SPM)
Q. A 66.6% risk is considered as
  • (A) very low
  • (B) low
  • (C) moderate
  • (D) high
πŸ’¬ Discuss
βœ… Correct Answer: (D) high

Explanation: the probability of the risk might be assessed as very low (<10%), low (10–25%), moderate (25–50%), high (50–

πŸ“Š Software Project Management (SPM)
Q. Which of the following is/are main parameters that you should use when computing the costs of a software development project?
  • (A) travel and training costs
  • (B) hardware and software costs
  • (C) effort costs (the costs of paying software engineers and managers)
  • (D) all of the mentioned
πŸ’¬ Discuss
βœ… Correct Answer: (D) all of the mentioned

Explanation: estimation involves working out how much effort is required to complete each activity and, from this, calculating the total cost of activities.

πŸ“Š Software Project Management (SPM)
Q. Quality planning is the process of developing a quality plan for
  • (A) team
  • (B) project
  • (C) customers
  • (D) project manager
πŸ’¬ Discuss
βœ… Correct Answer: (B) project

Explanation: the quality plan should set out the desired software qualities and describe how these are to be assessed.

πŸ“Š Software Project Management (SPM)
Q. Which of the following is incorrect activity for the configuration management of a software system?
  • (A) internship management
  • (B) change management
  • (C) version management
  • (D) system management
πŸ’¬ Discuss
βœ… Correct Answer: (A) internship management

Explanation: configuration management policies and processes define how to record and process proposed system changes, how to decide what system components to change, how to manage different versions of the system and its components, and how to distribute changes to customers.

πŸ“Š Software Project Management (SPM)
Q. An independent relationship must exist between the attribute that can be measured and the external quality attribute.
  • (A) true
  • (B) false
  • (C) ---
  • (D) ---
πŸ’¬ Discuss
βœ… Correct Answer: (B) false

Explanation: the value of the quality attribute must be related, in some way, to the value of the attribute than can be measured.

πŸ“Š Software Project Management (SPM)
Q. Which of these truly defines Software design?
  • (A) software design is an activity subjected to constraints
  • (B) software design specifies nature and composition of software product
  • (C) software design satisfies client needs and desires
  • (D) all of the mentioned
πŸ’¬ Discuss
βœ… Correct Answer: (D) all of the mentioned

Explanation: software design explains all of the statements as its definition.

Jump to