πŸ“Š Production Management
Q. The production data base containing information about each of the components that a firm produces or purchases is the
  • (A) Routing files
  • (B) Work centre master files
  • (C) Control files
  • (D) Item master files
πŸ’¬ Discuss
βœ… Correct Answer: (D) Item master files
πŸ“Š Production Management
Q. Which of the following files trucks work order progress ?
  • (A) Work centre master files
  • (B) Routing files
  • (C) Item master files
  • (D) Control files
πŸ’¬ Discuss
βœ… Correct Answer: (D) Control files
πŸ“Š Production Management
Q. Which of the following is not a part of the planning files of a production planning and control systems
  • (A) A progress file
  • (B) A work centre master file
  • (C) Minimizing WIP inventory
  • (D) Maximizing utilization
πŸ’¬ Discuss
βœ… Correct Answer: (A) A progress file
πŸ“Š Production Management
Q. Which file contain important information regarding on items flow through the shop ?
  • (A) Routing file
  • (B) Work centre master file
  • (C) Control files
  • (D) Item master file
πŸ’¬ Discuss
βœ… Correct Answer: (A) Routing file
πŸ“Š Production Management
Q. Forward scheduling
  • (A) Begins with a delivery date ,then each operations is offset one at a time ,in reverse order
  • (B) Is well suited where the supplier is usually able to meet precise delivery dates
  • (C) Tends to minimize in process inventory
  • (D) Assumes that procurement of material and operations start as soon as requirement are known
πŸ’¬ Discuss
βœ… Correct Answer: (D) Assumes that procurement of material and operations start as soon as requirement are known
πŸ“Š Production Management
Q. Which of the following is not effectiveness criterion for scheduling?
  • (A) Maximizing flow time
  • (B) Maximizing completion time
  • (C) Minimizing WIP inventory
  • (D) Maximizing utilization
πŸ’¬ Discuss
βœ… Correct Answer: (A) Maximizing flow time
πŸ“Š Production Management
Q. Which scheduling technique should be employed when due dates are important for a job order ?
  • (A) Forward scheduling
  • (B) Loading
  • (C) Dispatching
  • (D) Backward scheduling
πŸ’¬ Discuss
βœ… Correct Answer: (D) Backward scheduling
πŸ“Š Production Management
Q. Which of the following best describes how short term schedules are prepared? short term schedules are prepared
  • (A) Directly from the aggregate plans
  • (B) Directly from the capacity plans
  • (C) From inventory records for items that have been used up
  • (D) From master schedules which are derived from aggregate plans
πŸ’¬ Discuss
βœ… Correct Answer: (D) From master schedules which are derived from aggregate plans
πŸ“Š Production Management
Q. Which of the following is true regarding forward scheduling? Forward scheduling is the scheduling of
  • (A) The end items or finished products
  • (B) Jobs as soon as the requirements are known
  • (C) The start items or component parts
  • (D) The final operations first beginning with the due date
πŸ’¬ Discuss
βœ… Correct Answer: (B) Jobs as soon as the requirements are known
πŸ“Š Production Management
Q. What do flexible manufacturing systems (FMS) do?
  • (A) Moves materials between opportunities
  • (B) Moves and manipulates products , parts on tolls
  • (C) Co-ordinates the whole process of manufacturing and manufactures a part, components or products
  • (D) Completely manufactures a range of components without significant human inventions during the processing
πŸ’¬ Discuss
βœ… Correct Answer: (D) Completely manufactures a range of components without significant human inventions during the processing