V Vikash Gupta π Tutor III β 33.56K Points π Production Management Q. The production data base containing information about each of the components that a firm produces or purchases is the (A) Routing files (B) Work centre master files (C) Control files (D) Item master files ποΈ Show Answer π¬ Discuss π Share β‘Menu β Correct Answer: (D) Item master files
G Gopal Sharma π Tutor III β 38.32K Points π Production Management Q. Which of the following files trucks work order progress ? (A) Work centre master files (B) Routing files (C) Item master files (D) Control files ποΈ Show Answer π¬ Discuss π Share β‘Menu β Correct Answer: (D) Control files
P Praveen Singh π Tutor III β 36.81K Points π Production Management Q. Which of the following is not a part of the planning files of a production planning and control systems (A) A progress file (B) A work centre master file (C) Minimizing WIP inventory (D) Maximizing utilization ποΈ Show Answer π¬ Discuss π Share β‘Menu β Correct Answer: (A) A progress file
R Rakesh Kumar π Hard Worker β 28.44K Points π Production Management Q. Which file contain important information regarding on items flow through the shop ? (A) Routing file (B) Work centre master file (C) Control files (D) Item master file ποΈ Show Answer π¬ Discuss π Share β‘Menu β Correct Answer: (A) Routing file
R Ranjeet π Tutor III β 34.60K Points π Production Management Q. Forward scheduling (A) Begins with a delivery date ,then each operations is offset one at a time ,in reverse order (B) Is well suited where the supplier is usually able to meet precise delivery dates (C) Tends to minimize in process inventory (D) Assumes that procurement of material and operations start as soon as requirement are known ποΈ Show Answer π¬ Discuss π Share β‘Menu β Correct Answer: (D) Assumes that procurement of material and operations start as soon as requirement are known
V Vikash Gupta π Tutor III β 33.56K Points π Production Management Q. Which of the following is not effectiveness criterion for scheduling? (A) Maximizing flow time (B) Maximizing completion time (C) Minimizing WIP inventory (D) Maximizing utilization ποΈ Show Answer π¬ Discuss π Share β‘Menu β Correct Answer: (A) Maximizing flow time
V Vikash Gupta π Tutor III β 33.56K Points π Production Management Q. Which scheduling technique should be employed when due dates are important for a job order ? (A) Forward scheduling (B) Loading (C) Dispatching (D) Backward scheduling ποΈ Show Answer π¬ Discuss π Share β‘Menu β Correct Answer: (D) Backward scheduling
G Gopal Sharma π Tutor III β 38.32K Points π Production Management Q. Which of the following best describes how short term schedules are prepared? short term schedules are prepared (A) Directly from the aggregate plans (B) Directly from the capacity plans (C) From inventory records for items that have been used up (D) From master schedules which are derived from aggregate plans ποΈ Show Answer π¬ Discuss π Share β‘Menu β Correct Answer: (D) From master schedules which are derived from aggregate plans
V Vikash Gupta π Tutor III β 33.56K Points π Production Management Q. Which of the following is true regarding forward scheduling? Forward scheduling is the scheduling of (A) The end items or finished products (B) Jobs as soon as the requirements are known (C) The start items or component parts (D) The final operations first beginning with the due date ποΈ Show Answer π¬ Discuss π Share β‘Menu β Correct Answer: (B) Jobs as soon as the requirements are known
V Vinay π Mover β 28.75K Points π Production Management Q. What do flexible manufacturing systems (FMS) do? (A) Moves materials between opportunities (B) Moves and manipulates products , parts on tolls (C) Co-ordinates the whole process of manufacturing and manufactures a part, components or products (D) Completely manufactures a range of components without significant human inventions during the processing ποΈ Show Answer π¬ Discuss π Share β‘Menu β Correct Answer: (D) Completely manufactures a range of components without significant human inventions during the processing