V Vijay Sangwan π Mover β 28.62K Points π Production Management Q. The process through which inputs are converted into output is referred to as (A) The transformation process (B) Manufacturing (C) Materials management (D) Physical distribution ποΈ Show Answer π¬ Discuss π Share β‘Menu β Correct Answer: (A) The transformation process
P Priyanka Tomar π Tutor III β 35.28K Points π Production Management Q. Which of the following is not difference between manufacturers and service providers (A) Nature and consumption of output (B) Uniformity of inputs (C) Uniformity of outputs (D) Nature and consumption of input ποΈ Show Answer π¬ Discuss π Share β‘Menu β Correct Answer: (A) Nature and consumption of output
R Ram Sharma π Coach β 193.88K Points π Production Management Q. The development and administration of the activities involved in transforming resources into goods and services is known as (A) Operations management (B) Manufacturing (C) The transformation process (D) Production ποΈ Show Answer π¬ Discuss π Share β‘Menu β Correct Answer: (A) Operations management
R Ram Sharma π Coach β 193.88K Points π Production Management Q. Getting products to consumers obtaining and managing raw materials and packaging finished products are all activities of (A) Procurement (B) Logistics (C) Production (D) Materials management ποΈ Show Answer π¬ Discuss π Share β‘Menu β Correct Answer: (D) Materials management
V Vikash Gupta π Tutor III β 33.56K Points π Production Management Q. In a large company , the department charged with determining the actual process to be used in turning inputs to output is (A) Marketing research (B) Engineering (C) Operations (D) Product planning ποΈ Show Answer π¬ Discuss π Share β‘Menu β Correct Answer: (C) Operations
A Admin π Coach β 38.37K Points π Production Management Q. The raw materials , components , completed or partially completed products ,and pieces of equipment a firm uses are often referred to as (A) Inventory (B) Order quantities (C) Production (D) Outputs ποΈ Show Answer π¬ Discuss π Share β‘Menu β Correct Answer: (A) Inventory
R Rakesh Kumar π Hard Worker β 28.44K Points π Production Management Q. Resources such as labour materials and energy are known as ……………. In the transformation process (A) Output (B) Intangibles (C) Factors of production (D) Inputs ποΈ Show Answer π¬ Discuss π Share β‘Menu β Correct Answer: (D) Inputs
V Vikash Gupta π Tutor III β 33.56K Points π Production Management Q. Use of sequencing role shortest processing time generally result in (A) Minimum average lateness (B) Maximum utilization (C) Maximum effectiveness (D) Minimum average flow time ποΈ Show Answer π¬ Discuss π Share β‘Menu β Correct Answer: (D) Minimum average flow time
V Vijay Sangwan π Mover β 28.62K Points π Production Management Q. Sequencing (or dispatching) (A) Assign dates to specific jobs or operations (B) Assign jobs to work centers (C) Specifies the order in which job should be done at each centre (D) Assigns workers to jobs ποΈ Show Answer π¬ Discuss π Share β‘Menu β Correct Answer: (C) Specifies the order in which job should be done at each centre
V Vinay π Mover β 28.75K Points π Production Management Q. The short term scheduling activity called loading (A) Assign dates to specific jobs or operations steps (B) Specifies the order in which jobs should be done at each center (C) Assigns jobs to work centers (D) Assign workers to jobs ποΈ Show Answer π¬ Discuss π Share β‘Menu β Correct Answer: (C) Assigns jobs to work centers