Q. Which of the following are pitfalls of subcontracting? 1. It lowers the morale of all workers 2. It wears out the workers and the overall productivity drops off 3. It risks opening the clients door to a competitor 4. It may be expensive
Q. Which of the following are inputs received during the design phase? 1. Functional specifications of the project 2. System design specifications 3. Preliminary project evaluation details 4. Project proposal
Q. _________ plan and manage the project on a day-to-day basis for this stage _________ define the coordination, control activities and identify the suitable personnel to carry them out.
Q. Histograms are used for which of the following?
1. To record huge volumes of data about a process.
2. To indicate the extent of each category of problems in descending order of magnitude of the problem
3. To reveal if the pattern of distribution has a single peak, or many peaks.
4. To locate the points at which a problem exists.
Q. Which of the following are the features of process layout?
1 Emphasis is on special orders or products having significant and frequent design changes.
2. Standardized product with little or no design changes.
3. Minimum requirement of in-process inspection.
4. Use of general purpose machines.