πŸ“Š Production and Operation Management
Q. The decision in a sequential sampling scheme is taken ______.
  • (A) after inspecting the sample as a whole.
  • (B) after selection and inspection of items one by one.
  • (C) before inspecting the sample as a whole.
  • (D) before selection and inspection of items one by one
πŸ’¬ Discuss
βœ… Correct Answer: (B) after selection and inspection of items one by one.
πŸ“Š Production and Operation Management
Q. A sequential sampling plan is ________.
  • (A) an infinite process.
  • (B) the process requiring much more sampling units than a fixed sized sample.
  • (C) a process in which sampling terminates with probability one .
  • (D) a finite process.
πŸ’¬ Discuss
βœ… Correct Answer: (C) a process in which sampling terminates with probability one .
πŸ“Š Production and Operation Management
Q. A control chart based on known parameter values is_________.
  • (A) more advantageous than the one based on estimated values.
  • (B) complicated than that of control chart based on estimated values .
  • (C) less reliable than the control chart based on estimated values.
  • (D) less reliable than the control chart based on calculated values.
πŸ’¬ Discuss
βœ… Correct Answer: (A) more advantageous than the one based on estimated values.
πŸ“Š Production and Operation Management
Q. The expected sample size required to arrive at a decision about the lot is called_______.
  • (A) random variable.
  • (B) average sample number.
  • (C) random design.
  • (D) average sample size.
πŸ’¬ Discuss
βœ… Correct Answer: (B) average sample number.
πŸ“Š Production and Operation Management
Q. Sampling inspection procedure by variables as compared to by attributes is _______.
  • (A) more prevalent.
  • (B) non- practiced.
  • (C) less prevalent.
  • (D) practiced.
πŸ’¬ Discuss
βœ… Correct Answer: (C) less prevalent.
πŸ“Š Production and Operation Management
Q. The control limits delimited by the consumer are called _________.
  • (A) modified control limits.
  • (B) natural control limits.
  • (C) specified control limits.
  • (D) artificial control limits.
πŸ’¬ Discuss
βœ… Correct Answer: (B) natural control limits.
πŸ“Š Production and Operation Management
Q. To ensure that the proportion of defective items in the manufactured product is not beyond certain limits is called ______.
  • (A) process control.
  • (B) system control.
  • (C) product control.
  • (D) systematic control.
πŸ’¬ Discuss
βœ… Correct Answer: (A) process control.
πŸ“Š Production and Operation Management
Q. In double sampling plan, there is a ________ percent saving is sampling inspection as compared to single sampling plan.
  • (A) 1-9.
  • (B) 10-17.
  • (C) 18-24.
  • (D) 25-33.
πŸ’¬ Discuss
βœ… Correct Answer: (D) 25-33.
πŸ“Š Production and Operation Management
Q. Automation version of the generic manufacturing process, where in the three manufacturing functions are replaced by the automated technologies is called _______.
  • (A) automated materials handling system.
  • (B) flexible manufacturing system.
  • (C) computer integrated manufacturing system.
  • (D) production planning system.
πŸ’¬ Discuss
βœ… Correct Answer: (A) automated materials handling system.